|
|
|
Mohamed Assaf, Mohamed Hussein, Sherif Abdelkhalek and Tarek Zayed
Off-site construction (OSC) is an innovative construction method that transfers most of the site-based work to a more controlled environment. Construction waste minimization, speedy schedules, higher sustainability, and better quality are some of the per...
ver más
|
|
|
|
|
|
|
Theo Theunissen,Stijn Hoppenbrouwers,Sietse Overbeek
Pág. 1 - 27
It is common practice for practitioners in industry as well as for ICT/CS students to keep writing ? and reading ? about software products to a bare minimum. However, refraining from documentation may result in severe issues concerning the vaporization ...
ver más
|
|
|
|
|
|
|
Charlotte Svensson Tengberg and Carl-Eric Hagentoft
Design-build contractors are challenged with the task of minimizing failure risks when introducing new technical solutions or adapting technical solutions to new conditions, e.g., climate change. They seem to have a disproportional trust in suppliers and...
ver más
|
|
|
|
|
|
|
Bruno Ribeiro Marques,Odilon Cavallari de Oliveira,Paulo Cavichioli Carmona
The purpose of this article is to analyze whether expansion allowed cases for design-build biddings might improve positive impacts on the efficiency of public procedures. Hence, both Brazilian and international experiences will be studied with attention ...
ver más
|
|
|
|
|
|
|
Jan Bröchner, Johan Silfwerbrand
Design-build contracts with performance-based specifications are believed to raise productivity and the innovation rate. Such specifications for highway and bridge contracts may create risks, be too detailed or difficult to verify. The purpose has been t...
ver más
|
|
|
|
|
|
|
Nabil Mohareb,Sara Maassarani
Pág. 146 - 161
|
|
|
|
|
|
|
Nur Hanim Ilias,Nur Huzeima Mohd Hussain,Azran Mansor,Siti Syamimi Omar
Pág. 77 - 85
Recycle Edible Garden (REG) is a green initiative green project that was composed to accommodate the community with edible resources, rainwater harvesting and reuse materials towards achieving subsistence living. This paper documented the rationale, risk...
ver más
|
|
|
|
|
|
|
Antonius W. Djojopranoto,Brad L. Benhart
Pág. 7 - 13
Design-build (DB) is a project delivery that has already been used widely in USA, UK, Singapore and in other countries. However, it is not widely used in Indonesia and there are limited studies available on DB. The purpose of this paper is to quantify pr...
ver más
|
|
|
|
|
|
|
Kevin McLain, Douglas D. Gransberg, Micheal C. Loulakis
Pág. 1 - 19
Awarding design-build (DB) contracts before a complete subsurface investigation is completed, makes mitigating the risk of differing site conditions difficult, if not impossible. The purpose of the study was to identify effective practices for managing g...
ver más
|
|
|
|
|