|
|
|
Um E Hani Habib, Abdur Rehman Nasir, Fahim Ullah, Siddra Qayyum and Muhammad Jamaluddin Thaheem
Building information modeling (BIM) through data-rich digital representation has revolutionized the architecture, engineering, and construction (AEC) industry. BIM implementation in the AEC industry has noticeably increased over the last decade. Various ...
ver más
|
|
|
|
|
|
|
Maria Calahorra-Jimenez, Luis Fernando Alarcon, Cristina Torres-Machi , Alondra Chamorro, Keith Molenaar
Pág. 334 - 345
|
|
|
|
|
|
|
Ahmed Kamal Ali
Pág. 48 - 61
In this paper, we develop a novel method for integrating system thinking into architectural design by mapping its processes in a standard process modeling language. We structured a decision-support framework using process mapping workflows to incorporate...
ver más
|
|
|
|
|
|
|
Kevin Luna-Villareal, Eugenio Pellicer, Salvador García-Rodríguez
Pág. 133 - 144
Performance measurement in residential housing, at a company or project level, is usually assessed using financial performance indicators. There are other performance indicators that can be also applied to the construction industry. The literature review...
ver más
|
|
|
|
|
|
|
Dada, M.O.
Pág. 1 - 10
This study sought to investigate the assessment of client and contractor organizations on the use of the design-bid-build method for project delivery in Nigeria. One hundred fifty seven questionnaires were administered purposively on contracting and clie...
ver más
|
|
|
|
|
|
|
Alfonso Bastias, Keith R. Molenaar
Pág. Page 5 - 20
The primary method of public sector project delivery in the United States (U.S.) has traditionally been design-bid-build delivery. The public sector has historically separated design and construction contracts. In the 1990s, the U.S. public sector began ...
ver más
|
|
|
|
|
|
|
Ekambaram Palaneewaran, Mohan Kumaraswamy, Xue Quing Zhang
Pág. 21 - 34
The emerging focus on "best value" in construction projects entails several crucial and complex decision-making tasks for appropriate selection of capable contractors and consultants. In many ways and thus could be correspondingly achieved at different l...
ver más
|
|
|
|