|
|
|
Alfonso Bastias, Keith R. Molenaar
Pág. Page 5 - 20
The primary method of public sector project delivery in the United States (U.S.) has traditionally been design-bid-build delivery. The public sector has historically separated design and construction contracts. In the 1990s, the U.S. public sector began ...
ver más
|
|
|