|
|
|
Abid Soomro, Keith R. Pullen and Mustafa E. Amiryar
Due to low system inertia in microgrids, frequencies may vary rapidly from the nominal value, leading to the complete blackout of the system unless there is an adequate spinning reserve available for balancing the supply with the demand load. This issue ...
ver más
|
|
|
|
|
|
|
Mustafa E. Amiryar, Keith R. Pullen and Daniel Nankoo
Energy storage systems (ESS) are key elements that can be used to improve electrical system efficiency by contributing to balance of supply and demand. They provide a means for enhancing the power quality and stability of electrical systems. They can enh...
ver más
|
|
|
|
|
|
|
Mustafa E. Amiryar and Keith R. Pullen
Energy storage systems (ESS) provide a means for improving the efficiency of electrical systems when there are imbalances between supply and demand. Additionally, they are a key element for improving the stability and quality of electrical networks. They...
ver más
|
|
|
|
|
|
|
Carol A. Rolando, Brenda R. Baillie, Dean G. Thompson and Keith M. Little
Glyphosate-based herbicides are the dominant products used internationally for control of vegetation in planted forests. Few international, scientific syntheses on glyphosate, specific to its use in planted forests, are publically available. We provide a...
ver más
|
|
|
|
|
|
|
Moinuddin Ghauri, Abrar Inayat, Muhammad Tariq Bashir, Salmiaton B. Ali and Keith R. Cliffe
The current study is focused on controlling sulphur emissions by pre-treating coal to remove sulphur prior to combustion using the oxydesulphurisation technique. Three British coals were chosen for the study. Working with these coals gave a better insigh...
ver más
|
|
|
|
|
|
|
Keith M. Stamplecoskie, Thomas R. Binder, Nicola Lower, Karl Cottenie, Robert L. McLaughlin & D. Gordon McDonald
Pág. 563 - 572
|
|
|
|
|
|
|
Keith Kirby, C.M. Reid and R. Green
Pág. 295 - 301
|
|
|
|
|
|
|
Bruno Basso, Osvaldo Gargiulo, Keith Paustian, G. Philip Robertson, Cheryl Porter, Peter R. Grace and James W. Jones
Pág. 69 - 78
|
|
|
|
|
|
|
Alfonso Bastias, Keith R. Molenaar
Pág. Page 5 - 20
The primary method of public sector project delivery in the United States (U.S.) has traditionally been design-bid-build delivery. The public sector has historically separated design and construction contracts. In the 1990s, the U.S. public sector began ...
ver más
|
|
|
|
|
|
|
María M. Díaz Arias, Jean C. Batzer, Thomas C. Harrington, Amy Wang Wong, Steven C. Bost, Daniel R. Cooley, Michael A. Ellis, John R. Hartman, David A. Rosenberger, George W. Sundin, Turner B. Sutton, James W. Travis, Michael J. Wheeler, Keith S. Yoder, a
Pág. 345 - 355
|
|
|
|