40   Artículos

 
en línea
Jaime Perez-Martinez and Rodrigo Perez Fernandez    
Since the introduction of scientific disciplines into the shipbuilding process, there has been a search for optimisation of human and material resources. The current environmental crisis is putting additional pressure on global resource management and sp... ver más
Revista: Journal of Marine Science and Engineering    Formato: Electrónico

 
en línea
Mohamed Badawy, Fahad K. Alqahtani and Mohamed Sherif    
The ability to foresee hazards early plays a critical role in estimating the entire cost of a project. Although several studies have established models to predict the total cost of a project at a conceptual stage, there remains a research vacuum in measu... ver más
Revista: Buildings    Formato: Electrónico

 
en línea
Isabella Silverman, Blaze Engelman, Alexa Leone, Michael Rothenbucher, Allison Munch, Josph Sorrentino, Brandon Markiewicz, Chris Pearson, Chris Baxter, Craig Swanson, George Tsiatas and Malcolm Spaulding    
Under the STORMTOOLS initiative, maps of the impact of sea level rise (SLR) (0 to 12 ft), nuisance flooding (1?10 yr), 25, 50, and 100 yr storms, and hindcasts of the four top ranked tropical storms have been developed for the coastal waters of Rhode Isl... ver más
Revista: Journal of Marine Science and Engineering    Formato: Electrónico

 
en línea
Jabar H. Yousif, Saif N. Abdul Majeed and Fouad J. I. Al Azzawi    
Quantity Surveying (QS) is a process concerned with controlling and managing the costs of construction projects. QS Measurement relies on sophisticated measurement rules that are understood by experienced practitioners. Traditional QS systems, such as st... ver más
Revista: Infrastructures    Formato: Electrónico

 
en línea
Larysa Filipkovska, Marina Nos     Pág. 66 - 74
The subject of the study is the conditions and procedures for managing the cost of an innovative project. The purpose of the work is to form approaches to managing the cost of an innovative project at an industrial enterprise on the basis of an integrate... ver más

 
en línea
Pijush Samui, Nhat-Duc Hoang, Viet-Ha Nhu, My-Linh Nguyen, Phuong Thao Thi Ngo and Dieu Tien Bui    
In the design phase of housing projects, predicting the settlement of soil layers beneath the buildings requires the estimation of the coefficient of soil compression. This study proposes a low-cost, fast, and reliable alternative for estimating this soi... ver más
Revista: Applied Sciences    Formato: Electrónico

 
en línea
An accurate cost estimate not only plays a key role in project feasibility studies but also in achieving a final successful outcome. Conventionally, estimating cost typically relies on the experience of professionals and cost data from previous projects.... ver más
Revista: Buildings    Formato: Electrónico

 
en línea
Alina Mikhnova, Dmutro Mikhnov, Kateryna Chyrkova     Pág. 69 - 76
The subject of the study in the article is the process of modernization of automated workingplaces of specialized information systems of the organization. The purpose of the work is to develop a method for evaluating the efficiency of modernization of au... ver más

 
en línea
???????? ??????? ???????     Pág. 23 - 32
The subject matter of the article is the factors that increase the efficiency of internal communications by selecting high-quality hardware. The goal of the article is to build a model for assessing the quality of hardware to be used in the communication... ver más

 
en línea
Binbin Peng and Jie Song    
Sea-level rise (SLR) will magnify the impacts of storm surge; the resulting severe flooding and inundation can cause huge damage to coastal communities. Community leaders are considering implementing adaptation strategies, typically hard engineering proj... ver más
Revista: Water    Formato: Electrónico

« Anterior     Página: 1 de 2     Siguiente »