3   Artículos

 
en línea
Rosa Ma Amaya-Toral, Manuel R. Piña-Monarrez, Rosa María Reyes-Martínez, Jorge de la Riva-Rodríguez, Eduardo Rafael Poblano-Ojinaga, Jaime Sánchez-Leal and Karina Cecilia Arredondo-Soto    
Machine workshops generate high scrap rates, causing non-compliance with timely delivery and high production costs. Due to their natural characteristics of a low volume, high-mix production batches, and serial and parallel configurations, generally the c... ver más
Revista: Applied Sciences    Formato: Electrónico

 
en línea
Charlotte Svensson Tengberg and Carl-Eric Hagentoft    
Design-build contractors are challenged with the task of minimizing failure risks when introducing new technical solutions or adapting technical solutions to new conditions, e.g., climate change. They seem to have a disproportional trust in suppliers and... ver más
Revista: Buildings    Formato: Electrónico

« Anterior     Página: 1 de 1     Siguiente »