|
|
|
Jianye Li, Qian Fang, Xiang Liu, Jianming Du, Gan Wang and Jun Wang
This article investigates and presents a case study on the Beijing Subway Line 12 excavation beneath the existing Qinghuayuan Tunnel. The composite pre-reinforcement technique was used in conjunction with the shallow tunneling method to control the disto...
ver más
|
|
|