Osama A. I. Hussain, Robert C. Moehler, Stuart D. C. Walsh and Dominic D. Ahiaga-Dagbui    
Mega projects delivering rail infrastructure are constantly seeking cost-effective and efficient technologies to sustain the growing population. Building information modeling (BIM) and BIM for cost management (5D-BIM) have shown great potential in the bu... ver más
Revista: Infrastructures    Formato: Electrónico

 
en línea
Khalid K. Naji, Murat Gunduz and Mohamed Adalbi    
Fast-track construction has recently become the prevailing construction approach globally. It enables owners and developers to make rapid returns on investment through shortened construction periods. This strategy has many effects on the industry; theref... ver más
Revista: Buildings    Formato: Electrónico

 
en línea
Ali Paydar, Yaser Khademi Fahraji, Abbas Tajaddini, Zahra Sabzi     Pág. 382 - 406
Revista: Revista de la Construcción    Formato: Electrónico

 
en línea
Wenwen Xie, Binchao Deng, Yilin Yin, Xindong Lv and Zhenhua Deng    
Construction industries have poor cost performance in terms of finishing projects within a budget. A fuzzy model for evaluating the critical factors of cost overrun for construction projects in China is developed by identifying, classifying and ranking c... ver más
Revista: Buildings    Formato: Electrónico

 
en línea
Chrysothemis Paraskevopoulou and Georgios Boutsis    
Tunnelling projects seldom meet the initial budget requirements. Commonly, these types of projects suffer from cost overruns, which subsequently lead to project delivery delays mainly due to unsuccessful ground investigation as specified in the literatur... ver más
Revista: Infrastructures    Formato: Electrónico

 
en línea
Ashem Emmanuel Egila,Oluwaseun Abdulakeem Balogun,Saheed Olanrewaju Yusuf     Pág. 1184 - 1200
Revista: Independent Journal of Management & Production    Formato: Electrónico

 
en línea
Pamela Akinyi Oyieyo, Charles M Rambo, Anne Ndiritu     Pág. 351 - 356

 
en línea
Mohammadreza Habibi, Sharareh Kermanshachi and Behzad Rouhanizadeh    
Delay and cost overrun in construction projects are two widespread problems that arouse practitioners? and scholars? concern. Therefore, the objective of this study was to identify Key Performance Indicators (KPIs) in each of Engineering, Procurement and... ver más
Revista: Infrastructures    Formato: Electrónico

 
en línea
Revista: Buildings    Formato: Electrónico