|
|
|
M. A. Arbuzov,O. M. Patlasov,S. O. Tokariev
Pág. 64 - 78
|
|
|
|
|
|
|
V. V. Rybkin,O. M. Patlasov,M. A. Arbuzov
Pág. 91 - 93
The article presents a method of determination of possibility of laying of long welded track on the repaired ground bed. Such criteria of the ground bed stabilization as stability parameter and stability coefficient are introduced.
|
|
|
|
|
|
|
V. V. Rybkin,M. O. Arbuzov
Pág. 107 - 109
Comparison of the longitudinal stresses monitoring methods in continuous welded rails is made. It is determined, that the magnetic method is perspective.
|
|
|
|
|
|
|
V. V. Rybkin,M. A. Arbuzov
Pág. 74 - 77
Nowadays the maintenance of long welded rails track is an urgent problem of railway industry. The inexact diagnostic method of the stressed state of long welded rails is used now on railways of Ukraine. This method does not give a direct and true picture...
ver más
|
|
|
|