12   Artículos

 
en línea
Mehrdad Arashpour, Ron Wakefield, Nick Blismas, EWM lee     Pág. 83 - 92
The construction industry is plagued by long cycle times caused by variability in the supply chain. Variations or undesirable situations are the result of factors such as non-standard practices, work site accidents, inclement weather conditions and fault... ver más
Revista: Construction Economics and Building    Formato: Electrónico

 
en línea
Ehsan Gharaie, Ron Wakefield, Nick Blismas     Pág. 34 - 49
The Australian house building industry has been facing an increase in the average house completion time in the last decade. This increase in some states is quite dramatic. For instance, Western Australia has faced a 70 percent increase in the average hou... ver más

 
en línea
Nick Blismas, Alistair Gibb, Christine Pasquire     Pág. 9 - 15
Implementation of off-site production on construction projects isoften hindered by a number of specific process and procurementconstraints. These constraints are largely influenced by decisionswithin the control of construction clients, suggesting that t... ver más
Revista: Construction Economics and Building    Formato: Electrónico

« Anterior     Página: 1 de 1     Siguiente »