4   Artículos

 
en línea
Kevin McLain, Douglas D. Gransberg, Micheal C. Loulakis     Pág. 1 - 19
Awarding design-build (DB) contracts before a complete subsurface investigation is completed, makes mitigating the risk of differing site conditions difficult, if not impossible. The purpose of the study was to identify effective practices for managing g... ver más

« Anterior     Página: 1 de 1     Siguiente »