2   Artículos

 
en línea
Gogot Setyo Budi,Alvin Gilbert Tandiputra,Haven Kusuma Markho     Pág. 13 - 18
One of the common methods used to install pile foundation is hydraulic jacked-in machine. In this method, a pile is pushed down into the ground up to the predetermined depth. The method has similar principle to that of Cone Penetration Test (CPT). This p... ver más
Revista: Civil Engineering Dimension    Formato: Electrónico

« Anterior     Página: 1 de 1     Siguiente »