4   Artículos

 
en línea
Abdulah M. Alsugair, Naif M. Alsanabani and Khalid S. Al-Gahtani    
Raising the final contract cost (FCC) is a significant risk for project owners. This study hypothesizes that the factors that cause owner?s cost estimation (OCE) accuracy and FCC changes share the same causes, and a case study confirmed that the two vari... ver más
Revista: Buildings    Formato: Electrónico

 
en línea
Abdulkareem Alanazi, Khalid Al-Gahtani and Abdullah Alsugair    
Despite advancing Internet of Things (IoT) technologies, road projects often rely on inaccurate supplier data, making it difficult to determine the cost, quantity, quality, and transportation duration of the needed materials. The wrong choice of material... ver más
Revista: Infrastructures    Formato: Electrónico

 
en línea
Saud Alshammari, Khalid Al-Gahtani, Ibrahim Alhammad and Nuhu Braimah    
Revista: Buildings    Formato: Electrónico

« Anterior     Página: 1 de 1     Siguiente »