2   Artículos

 
en línea
Ersen Huang, Hongjun Ke and Huanhuan Hu    
In this paper, a fast construction method for a composite girder cable-stayed bridge is proposed. The method is used on the Xiangsizhou Bridge, and it complies with all bridge rules while reducing the entire construction time of the bridge by 4 months.
Revista: Applied Sciences    Formato: Electrónico

« Anterior     Página: 1 de 1     Siguiente »