|
|
|
Fachrurrazi Fachrurrazi,Abdullah Abdullah,Yuwaldi Away,Teuku Budi Aulia
Pág. 86 - 94
Problems for both delayed and accelerated activities in scheduling are common in most projects. This problem can implicate on the additional construction cost with different trends as a specific model. A model can provide valuable information to project ...
ver más
|
|
|
|
|
|
|
He Yin, Keming Mao, Jianzhe Zhao, Huidong Chang, Dazhi E and Zhenhua Tan
This study considered heated metal mark attribute recognition based on compressed convolutional neural networks (CNNs) models. Based on our previous works, the heated metal mark image benchmark dataset was further expanded. State-of-the-art lightweight C...
ver más
|
|
|
|
|
|
|
Valentina Conti, Silvia Orchi, Maria Pia Valentini, Marialisa Nigro, Raffaella Calò
Pág. 117 - 124
This study deals with the design and the evaluation of technological solutions for the electrification of public transport in urban areas. A Decision Support System (DSS) developed by ENEA ? within the Research program on Electric System (RSE) has been a...
ver más
|
|
|
|