97   Artículos

 
en línea
Jianying Wei, Yuming Liu, Xiaochun Lu, Yu Feng and Yadi Wang    
Tunnel construction projects are a classic type of repetitive project, and hold a crucial position in the construction industry. The linear scheduling method (LSM) has been in the spotlight in scheduling optimization for repetitive construction projects ... ver más
Revista: Applied Sciences    Formato: Electrónico

 
en línea
Fan Ding, Min Liu, Simon M. Hsiang, Peng Hu, Yuxiang Zhang and Kewang Jiang    
The complexity and uncertainty of construction projects contribute to low efficiency in the construction industry. This research applied the Takt-time planning method to optimize the construction working process, and proposed a risk control framework bas... ver más
Revista: Buildings    Formato: Electrónico

 
en línea
Chanwoo Lee, Minsu Cha, Hyeonmin Kim and Hunhee Cho    
Earthwork scheduling (during the planning phase of road construction) is an important task that directly affects the cost and time of a project. However, the current scheduling methods are not performed at a detailed level and carry forward gaps from the... ver más
Revista: Applied Sciences    Formato: Electrónico

 
en línea
Ahsan Waqar, Idris Othman, Dorin Radu, Zulfiqar Ali, Hamad Almujibah, Marijana Hadzima-Nyarko and Muhammad Basit Khan    
Over the course of the last twenty years, building information modeling (BIM) has emerged as a firmly established construction methodology integrating fundamental principles. The implementation of BIM methodologies possesses the capability to augment the... ver más
Revista: Applied Sciences    Formato: Electrónico

 
en línea
Musaab A. AlRushood, Fred Rahbar, Shokri Z. Selim and Fikri Dweiri    
The global COVID-19 pandemic forced the construction industry to a standstill. In the wake of the pandemic, this sector must be prepared to make bold, innovative moves to prepare for the future. Over the past few years, the use of drones and robotics has... ver más
Revista: Drones    Formato: Electrónico

 
en línea
Noaman Akbar Sheik, Peter Veelaert and Greet Deruyter    
BIM has become an intrinsic tool in managing building projects due to its ability to comprehensively represent information in digital form. However, using BIM as an information exchange tool is still in its infancy, particularly with regard to constructi... ver más
Revista: Buildings    Formato: Electrónico

 
en línea
Li-Wei Lung and Yu-Ren Wang    
A construction site features an open field and complexity and relies mainly on manual labor for construction progress, quality, and field management to facilitate job site coordination and productive results. It has a tremendous impact on the effectivene... ver más
Revista: Buildings    Formato: Electrónico

 
en línea
Endah Murtiana Sari, Agustinus Purna Irawan, Mochamad Agung Wibowo, Januar Parlaungan Siregar, Rizal Zainuddin Tamin, Arief Kusuma Among Praja and Maya Puspita Dewi    
Many projects in Indonesia have implemented new strategies in response to the COVID-19 outbreak. Many projects suffered unexpected losses during the COVID-19 pandemic, and conditions were unpredictable. This situation must be considered by all stakeholde... ver más
Revista: Buildings    Formato: Electrónico

 
en línea
Songsong Li, Qinghuai Liang, Kuo Han, Heng Wang and Jun Xu    
The construction of urban rail transit (URT) guides and promotes urban development. Different URT line construction schedule, including construction sequence (priority order of line construction) and construction timing (when to build), will have differe... ver más
Revista: Applied Sciences    Formato: Electrónico

 
en línea
Robert Lopez, Heap-Yih Chong and Conrad Pereira    
Limited empirical and qualitative studies focus on the detailed processes and obstacles for coordinating off-site prefabrication between builders and suppliers. This research aims to identify and address the obstacles that currently prevent the further e... ver más
Revista: Buildings    Formato: Electrónico

« Anterior     Página: 1 de 6     Siguiente »