|
|
|
Edward Hoppe, Keith Weakley, Park Thompson
Pág. 3943 - 3952
In an effort to reduce bridge lifecycle costs, the Virginia Department of Transportation (VDOT) has developed new design method aimed at the elimination of expansion joints. Various structural details have been experimented with, including full integral ...
ver más
|
|
|