Alexander Johannes Hacks and Dieter Brillert
In the sCO2-HeRo project, the Chair of Turbomachinery at the University of Duisburg-Essen developed, built and tested a turbomachine with an integral design in which the compressor, generator and turbine are housed in a single hermetic casing. However, b...
ver más
|
|
|
|
|
|
|
Alex Viktorov,Christopher Harwood
Pág. 13 - 23
CNSC formallyintroduced the term Design Extension Conditions (DEC) with the issue ofregulatory document REGDOC-2.5.2, ?Design of Reactor Facilities: Nuclear PowerPlants?. The primary drivers for this development were the desire to maintainalignment with ...
ver más
|
|
|
|
|
|
|
Elena Dinca,Daniel Dupleac,Ilie Prisecaru
Pág. 9 - 22
This paper presents the analysis of the consequences of a Station Black-Out (SBO) accident at a CANDU-6 NPP, considering both the reference case, without any heat sink credited for nuclear fuel cooling and the situation when an accident management measur...
ver más
|
|
|
|
|
|
|
Lawrence Stephen Criscione
This paper analyzes a reactivity management event at a US NPP (Nuclear Power Plant) which resulted in the unrecognized inadvertent passive shutdown of the reactor. The event was not documented in the NPP?s Corrective Action Program by the operating crew ...
ver más
|
|
|
|
|
|
|
Yea-Kuang Chan and Jyh-Cherng Gu
Due to the very complex sets of component systems, interrelated thermodynamic processes and seasonal change in operating conditions, it is relatively difficult to find an accurate model for turbine cycle of nuclear power plants (NPPs). This paper deals w...
ver más
|
|
|
|