Ebuka Valentine Iroha, Tsunemi Watanabe and Tsuchiya Satoshi
Many studies have been conducted on the poor performance of the construction industry. Nigeria?s construction industry has been linked to project delays and cost overruns, leading to many abandoned construction projects throughout the country. These issu...
ver más
|
|
|
|
|
|
|
Osama A. I. Hussain, Robert C. Moehler, Stuart D. C. Walsh and Dominic D. Ahiaga-Dagbui
Mega projects delivering rail infrastructure are constantly seeking cost-effective and efficient technologies to sustain the growing population. Building information modeling (BIM) and BIM for cost management (5D-BIM) have shown great potential in the bu...
ver más
|
|
|
|
|
|
|
Claudio Szwarcfiter, Yale T. Herer and Avraham Shtub
Industrial projects are plagued by uncertainties, often resulting in both time and cost overruns. This research introduces an innovative approach, employing Reinforcement Learning (RL), to address three distinct project management challenges within a set...
ver más
|
|
|
|
|
|
|
Svetlana S. Uvarova, Svetlana V. Belyaeva, Alexandr K. Orlov and Vadim S. Kankhva
Most large construction projects face the problem of cost overruns and failures to meet deadlines mainly due to changes in the cost of building materials. A lot of studies proved the high importance of the cost of building materials for the project budge...
ver más
|
|
|
|
|
|
|
Shumank Deep, Shankar Banerjee, Saurav Dixit and Nikolai Ivanovich Vatin
Highway construction projects have always suffered from cost overruns due to extended project delivery, causing a loss of public funds. Since highways are the backbone of a nation, the purpose of this study is to measure the criticality of the factors th...
ver más
|
|
|
|
|
|
|
Irwan Irwan,Melloukey Ardan,Nuril Mahda Rangkuti,Febrina Monalisa
Pág. 20 - 29
Project delays are the main contribution to project cost overruns. The research intends to determine the main factor that cause delays in construction projects at PT. PLN (PERSERO) UIP Sumbagut. In this research, there were 31 variables which were groupe...
ver más
|
|
|
|
|
|
|
Xiaoyu Li, Binchao Deng, Yilin Yin and Yu Jia
At present, the construction industry in China has problems such as low production efficiency, low technical efficiency, low management efficiency of the construction project, delayed delivery, budget overruns, and unreasonable risk allocation. Value man...
ver más
|
|
|
|
|
|
|
Um E Hani Habib, Abdur Rehman Nasir, Fahim Ullah, Siddra Qayyum and Muhammad Jamaluddin Thaheem
Building information modeling (BIM) through data-rich digital representation has revolutionized the architecture, engineering, and construction (AEC) industry. BIM implementation in the AEC industry has noticeably increased over the last decade. Various ...
ver más
|
|
|
|
|
|
|
Ayodeji Olatunji Aiyetan and Dillip Kumar Das
Infrastructure project delivery, specifically the delivery of water infrastructure projects, is a serious challenge in South Africa. Therefore, using the study context of water utility agencies in South Africa, the objective of this study was to examine ...
ver más
|
|
|
|
|
|
|
Jarrod Richards and Mostafa Seifan
Growing interest in the productivity of the infrastructure sector has increased due to cost and time overruns in major projects. In this regard, many developed countries have failed to implement a framework to ensure that project success is met through n...
ver más
|
|
|
|