|
|
|
B. Y. Bodnar, ?. B. Ochkasov, Y. B. Bodnar, D. V. Bobyr, M. V. Ocheretniuk
Pág. 32 - 44
|
|
|
|
|
|
|
L. V. Dubynets,O. L. Marenych,O. Yu. Baliichuk,A. S. Kortohus
Pág. 54 - 63
|
|
|
|
|
|
|
Y. L. Bolshakov,A. V. Antonov
Pág. 57 - 70
Purpose. The paper is aimed to determinate the main ways of increasing resource efficiency and exploitation of coal current collector surface inserts of speed electric rolling stock. Methodology. The research is based on the technique relies on the use o...
ver más
|
|
|
|
|
|
|
I. V. Zhukovytskyi,V. V. Skalozub,O. V. Vetrova,O. L. Zinenko
Pág. 74 - 78
In the paper the methods for construction of improved automated system of optimum management of locomotive depot operation have been offered. The described method of modeling the operative planning of work of the locomotives and locomotive brigades is ba...
ver más
|
|
|
|
|
|
|
H. K. Hetman,S. V. Arpul,E. O. Dovhan
Pág. 47 - 50
A method of determining optimal power range of tractive vehicles for passenger operations in case of applying several speed categories on traction area of a locomotive depot or a railroad has been developed.
|
|
|
|