24   Artículos

 
en línea
Shubhendu Kshitij Fuladi and Chang-Soo Kim    
In the real world of manufacturing systems, production planning is crucial for organizing and optimizing various manufacturing process components. The objective of this paper is to present a methodology for both static scheduling and dynamic scheduling. ... ver más
Revista: Algorithms    Formato: Electrónico

 
en línea
Yu-Hung Chang, Chien-Hung Liu and Shingchern D. You    
The dynamic flexible job-shop problem (DFJSP) is a realistic and challenging problem that many production plants face. As the product line becomes more complex, the machines may suddenly break down or resume service, so we need a dynamic scheduling frame... ver más
Revista: Information    Formato: Electrónico

 
en línea
Jili Kong and Zhen Wang    
With the gradual emergence of customized manufacturing, intelligent manufacturing systems have experienced widespread adoption, leading to a surge in research interests in the associated problem of intelligent scheduling. In this paper, we study the flex... ver más
Revista: Applied Sciences    Formato: Electrónico

 
en línea
Che Han Lim and Seung Ki Moon    
In a flexible job shop problem with transportation (FJSPT), a typical flexible manufacturing system comprises transporters that pick up and deliver jobs for processing at flexible job shops. This problem has grown in importance through the wide use of au... ver más
Revista: Applied Sciences    Formato: Electrónico

 
en línea
Jian Li, Huankun Li, Pengbo He, Liping Xu, Kui He and Shanhui Liu    
Green manufacturing has become a new production mode for the development and operation of modern and future manufacturing industries. The flexible job shop scheduling problem (FJSP), as one of the key core problems in the field of green manufacturing pro... ver más
Revista: Applied Sciences    Formato: Electrónico

 
en línea
Predrag Mitic, Suzana Petrovic Savic, Aleksandar Djordjevic, Milan Eric, Enes Sukic, Dejan Vidojevic and Miladin Stefanovic    
This research focuses on small- and medium-sized businesses that provide machining or other process services but do not produce their own products. Their daily manufacturing schedule varies according to client needs. Small- and medium-sized businesses st... ver más
Revista: Applied Sciences    Formato: Electrónico

 
en línea
Danial Rooyani and Fantahun Defersha    
The work in this paper is motivated by a recently published article in which the authors developed an efficient two-stage genetic algorithm for a comprehensive model of a flexible job-shop scheduling problem (FJSP). In this paper, we extend the applicati... ver más
Revista: Algorithms    Formato: Electrónico

 
en línea
Yajun Wang, Junyu Leng, Xiaoqi Liu, Jiajia Wang and Qiunan Meng    
Various production disturbances occurring in the flexible job shop production process may affect the production of the workshop, some of which may lead to the prolongation of production completion time. Therefore, a flexible job shop dynamic scheduling m... ver más
Revista: Applied Sciences    Formato: Electrónico

 
en línea
Emiro Antonio Campo, Jose Alejandro Cano, Rodrigo Gómez-Montoya, Elkin Rodríguez-Velásquez and Pablo Cortés    
The current requirements of many manufacturing companies, such as the fashion, textile, and clothing industries, involve the production of multiple products with different processing routes and products with short life cycles, which prevents obtaining de... ver más
Revista: Algorithms    Formato: Electrónico

 
en línea
Yan Liang and Qingdong Zhang    
This paper investigated the flexible job-shop scheduling problem with the heat treatment process. To solve this problem, we built an unified mathematical model of the heat treatment process and machining process. Up to now, this problem has not been inve... ver más
Revista: Algorithms    Formato: Electrónico

« Anterior     Página: 1 de 2     Siguiente »