|
|
|
Wenqiang Peng, Wenliang Lu, Sitian Liu, Yong Liu, Linfeng Xu and Fenglin Li
Accelerated bridge construction (ABC) has attracted much attention in China as a new and efficient construction method. However, the seismic performance of the connections between precast piers and other structures limits the application of ABC in medium...
ver más
|
|
|
|
|
|
|
Jiping Ge, Luqi Lai, Side Liu and Xingfei Yan
Socket connection need a groove reserved in the cap to accommodate a bridge pier, which greatly weaken the vertical bearing capacity of the cap. The conventional treatment measure is to increase the thickness of the cap, and the corresponding cost will i...
ver más
|
|
|
|
|
|
|
H. H. K. Sudani
Pág. 46 - 50
Reliability is one of the most important issues in design of technical systems. One way to increase reliability is to build a fault tolerant system implementation. In some systems, link failures between its elements occur. An example is the damage to a c...
ver más
|
|
|
|
|
|
|
Rodrigo Barros, José Samuel Giongo
Pág. 211 - 220
This paper analyzes the behavior of reinforced concrete two pile caps with embedded socket, used as connection in precast concrete structures. To this end, it was specifically studied the effect of the locking beam on the pile caps when supported by the ...
ver más
|
|
|
|
|
|
|
Josnier Ramos Guardarrama,Mercedes Canasí Piñeiro,José Angel Martínez Barbado
Pág. 68 a la 76
Se presentan los resultados de la modernización de las mediciones y el control de la ejecución de ensayos para la determinación de: las pérdidas de vacío y corriente de excitación, las pérdidas con carga e impedancia de cortocircuito y el incremento de t...
ver más
|
|
|
|