23   Artículos

 
en línea
Alcínia Zita Sampaio, Gonçalo Azevedo and Augusto Gomes    
Building information modelling (BIM) methodology has been implemented in the construction industry, reaching all sectors: multidisciplinary design development; construction planning and monitoring; and building management and maintenance. A complete BIM ... ver más
Revista: Buildings    Formato: Electrónico

 
en línea
Mili Turic, Stipe Celar, Srdjana Dragicevic and Linda Vickovic    
Effort estimation is always quite a challenge, especially for agile software development projects. This paper describes the process of building a Bayesian network model for effort prediction in agile development. Very few studies have addressed the appli... ver más
Revista: Applied Sciences    Formato: Electrónico

 
en línea
Augusto M. Gomes, Gonçalo Azevedo, Alcínia Zita Sampaio and Alberto Sánchez Lite    
Building Information Modelling (BIM) is a methodology supported on technological evolution achievements, and consists of a set of processes and tools that allows the creation of a digital three-dimensional model. The model centralizes information, in an ... ver más
Revista: Applied Sciences    Formato: Electrónico

 
en línea
Mohammed Najah Mahdi, Mohd Hazli Mohamed Zabil, Abdul Rahim Ahmad, Roslan Ismail, Yunus Yusoff, Lim Kok Cheng, Muhammad Sufyian Bin Mohd Azmi, Hayder Natiq and Hushalini Happala Naidu    
Project management planning and assessment are of great significance in project performance activities. Without a realistic and logical plan, it isn?t easy to handle project management efficiently. This paper presents a wide-ranging comprehensive review ... ver más
Revista: Applied Sciences    Formato: Electrónico

 
en línea
Samuel Denard, Atila Ertas, Susan Mengel and Stephen Ekwaro-Osire    
This paper presents results produced by a domain-independent system development model that enables objective and quantitative calculation of certain development cycle characteristics. The presentation recounts the model?s motivation and includes an outli... ver más
Revista: Applied Sciences    Formato: Electrónico

 
en línea
Muhammad Yaseen,Aida Mustapha,Noraini Ibrahim    
Many of the organizations often fail to deliver big size software projects in allocated time and budget. One of the main reason of exceed in time estimation is improper implementation of requirements and their integration as software requirements are int... ver más

 
en línea
Yoshinobu Tamura, Hironobu Sone and Shigeru Yamada    
The method of earned value management is traditionally applied to the progress assessment of actual software projects in many IT companies. Also, Open Source Software (OSS) are used under the various situations because of cost reduction, standardization,... ver más
Revista: Applied System Innovation    Formato: Electrónico

 
en línea
Stanislav Velykodniy, Zhanna Burlachenko, Svitlana Zaitseva-Velykodna     Pág. 25 - 35
Subject of the research is a software tool for construction of graphic network model of reengineering the software project. Purpose of the research is the development of technical architecture of software tool for automated design of network schedules fo... ver más

 
en línea
Peter Weiand, Michel Buchwald and Dominik Schwinn    
The German Aerospace Center is currently developing a new design environment for rotorcraft, which combines sizing, simulation and evaluation tasks into one toolbox. The complete environment applies distributed computation on the servers of the various i... ver más
Revista: Aerospace    Formato: Electrónico

 
en línea
A common barrier to achieving design intent is the absence of comprehensive information about operational performance during design development. This results in uninformed decision-making which impacts on actual building performance, in particular Whole ... ver más
Revista: Buildings    Formato: Electrónico

« Anterior     Página: 1 de 2     Siguiente »