Inicio  /  MINERALS ENGINEERING  /  Vol: 14 Núm: 3 Par: 0 (2001)  /  Artículo
ARTÍCULO
TITULO

Bio reactor simulation and modeling for a gold bio leaching process

Das    
T.    
Sen    
P.K.    

Resumen

No disponible

 Artículos similares

       
 
F.J. Rubio-Rincón, L. Welles, C.M. Lopez-Vazquez, M. Nierychlo, ... D. Brdjanovic     Pág. 53 - 64
Thiothrix caldifontis was the dominant microorganism (with an estimated bio-volume of 65 ± 3%) in a lab-scale enhanced biological phosphorus removal (EBPR) system containing 100 mg of sulphide per litre in the influent. After a gradual exposure to the pr... ver más
Revista: Water Research

 
Kevin S. Jewell, Sandro Castronovo, Arne Wick, Per Falås, ... Thomas A. Ternes     Pág. 550 - 557
The antibiotic trimethoprim (TMP), a micropollutant found at µg/L levels in raw wastewater, was investigated with regard to its (bio)transformation during biological wastewater treatment. A pilot-scale, nitrifying/denitrifying Sequencing Batch Reactor (S... ver más
Revista: Water Research

 
Nader Mahinpey, Pulikesi Murugan, Thilakavathi Mani and Renata Raina     Pág. 2736 - 2742
Revista: ENERGY AND FUELS

 
Leonard Ingram, Dinesh Mohan, Mark Bricka, Philip Steele, David Strobel, David Crocker, Brian Mitchell, Javeed Mohammad, Kelly Cantrell, and Charles U. Pittman Jr.     Pág. 614 - 625
Revista: ENERGY AND FUELS

 
Ozlem     Pág. 523 - 531