ARTÍCULO
TITULO

The preparation of plans and diagrams at South African mines. Where is the Boundary between the roles of mine and land surveyors?

 Artículos similares

       
 
Vittorio Merlo    
In the never-ending quest for better detection efficiency and spatial resolution, various thermal neutron detection schemes have been proposed over the years. Given the presence of some converting layers (typically boron, but 6LiF is also widely used now... ver más
Revista: Instruments

 
Steffen Axer, Bernhard Friedrich     Pág. 1645 - 1661
The objective of this paper is the development of a staged methodology that allows the estimation of signal timing information like cycle length, green and red time intervals for time-dependent fixed-time controlled and actuated intersections based on fl... ver más

 
Juan Camilo Aldana, Alfredo Serpell     Pág. 32 - 41
The construction industry generates the greatest quantity of solid waste in the world, which is now becoming an environmental and social problem for future generations. Efforts to decrease the impact of construction and demolition waste (C&DW) throug... ver más

 
Claudia de Stasio, Davide Fiorello, Francesca Fermi, Angelo Martino, ... Sujith Kollamthodi     Pág. 3189 - 3198
European cities face increasing challenges to their citizens? mobility. Urban transport systems are integral elements of the European transport system and are therefore of concern for the Common Transport Policy. Thus, the 2011 Transport White Paper call... ver más

 
Álvaro Luiz Guimarães Carneiro     Pág. 62 - 71
Several nuclear plants were built worldwide and will need to be shut down in a specific time for being near their recommended lifespan which is about 40 years. For this reason, the aims of the International Atomic Energy Agency (IAEA) is to guide and rec... ver más