|
|
|
Mohammadreza Habibi, Sharareh Kermanshachi and Behzad Rouhanizadeh
Delay and cost overrun in construction projects are two widespread problems that arouse practitioners? and scholars? concern. Therefore, the objective of this study was to identify Key Performance Indicators (KPIs) in each of Engineering, Procurement and...
ver más
|
|
|
|
|
|
Juan Camilo Paz, David Rozenboim, Álvaro Cuadros, Sandra Cano, John Escobar
Pág. 41 - 69
This paper tackles the problem of scheduling construction projects considering the influence of delay risks. In the actual body of knowledge, several methods have been proposed to handle this problem, starting from the Project Evaluation and Review Techn...
ver más
|
|
|
|
|
|
Sofia Anna Menesidou, Vasilios Katos and Georgios Kambourakis
Since their appearance at the dawn of the second millennium, Delay or Disruption Tolerant Networks (DTNs) have gradually evolved, spurring the development of a variety of methods and protocols for making them more secure and resilient. In this context, p...
ver más
|
|
|
|
|
|
Baris Baspinar, Emre Koyuncu, Gokhan Inalhan
Pág. 499 - 508
This work aims to build different types of data-driven approaches in modeling European ATM Network Flow to capture the behavior of delay propagation over the network. To build proper network models and set their parameters, we have utilized historical fl...
ver más
|
|
|
|
|
|
Samara Soares Leal, Paulo Eduardo Maciel de Almeida, Edward Chung
Pág. 1769 - 1780
The growth of vehicles? fleet circulating on urban streets constitutes a very strong tendency in recent years. The main consequence of this phenomenon refers to the increase of urban congestions, of average delays caused by vehicles waiting on traffic li...
ver más
|
|
|