Revistas
Artículos
Publicaciones
Documentos
REVISTA
Energies
TODAS
Inicio
/
Energies
/
Vol: 11 Núm: 10 Par: October (2018)
/
Artículo
ARTÍCULO
TITULO
Schedule Modeling to Estimate Typical Construction Durations and Areas of Risk for 1000 MW Ultra-Critical Coal-Fired Power Plants
Hyun-Chul Lee
Eul-Bum Lee and Douglas Alleman
Resumen
No disponible
Acceso
PÁGINAS
NÚMERO
Volumen: 11 Número: 10 Parte: October (2018)
MATERIAS
INFRAESTRUCTURA
REVISTAS SIMILARES
Buildings
ISPRS International Journal of Geo-Information
Revista Ingeniería de la Construcción
DOI
https://doi.org/10.3390/en11102850
Artículos similares
Partitioning of Cotton Field Evapotranspiration under Mulched Drip Irrigation Based on a Dual Crop Coefficient Model
Acceso
Fuqiang Tian, Pengju Yang, Hongchang Hu, Chao Dai
Pág. 1 - 18
Estimation of field crop evapotranspiration (ETc) and its partitioning into evaporation and transpiration, are of great importance in hydrological modeling and agricultural water management. In this study, we used a dual crop coefficient model SIMDualKc ...
ver más
Revista:
Water
SPECIALIZED MODEL OF THE ASSIGNMENT PROBLEM FOR THE SCHEDULE OF ACTIVITIES OF HIGHER EDUCATION INSTITUTIONS
Acceso
S. Yu. Razumov
Pág. 176 - 179
The method for modeling the creation of high school?s schedule as an assignment task with inhomogeneous parameters, and the basic directions of development are considered.
Revista:
Nauka ta Progres Transportu
MODELING AND AUTOMATION OF SCHEDULING TRAINING SESSIONS IN UNIVERSITIES
Acceso
I. M. Vyshniakova,S. Yu. Razumov
Pág. 18 - 21
It is considered the methods for automation creation of high school?s schedule, basic direction of development, describes results of half-automation creation of schedule.
Revista:
Nauka ta Progres Transportu
Revistas destacadas
Infrastructures
Informed Infraestructure
BiT
Revista de la Construcción
Ver todas las revistas