Resumen
This paper deals with no-idle flow shop scheduling problem with the objective of minimizing makespan. A new hybrid metaheuristic is proposed for the scheduling problem solution. The proposed method is compared with the best method reported in the literature. Experimental results show that the new method provides better solutions regarding the solution quality to set of problems evaluated.