ARTÍCULO
TITULO

Berth scheduling by simulated annealing

Kim    
K. H. Moon    
K. C.    

Resumen

No disponible

 Artículos similares

       
 
Meixian Jiang, Jian Zhou, Jiajia Feng, Lin Zhou, Fangzheng Ma and Guanghua Wu    
In this work, we study the integrated berth and crane scheduling problem in a tidal port with multiple terminals, considering the uncertainties, tides, maximum coverage of cranes and interference between cranes. For coping with the uncertainties, a certa... ver más

 
Nyamatari Anselem Tengecha and Xinyu Zhang    
In the existing literature, the berthing operations, the quay crane assignments, and the scheduling problems were usually conducted without considering the worker performances (WPs) and the yard truck tasks (YTTs). However, professionals in situ corrobor... ver más