ARTÍCULO
TITULO

A tabu search heuristic for the static multi-vehicle dial-a-ride problem

Cordeau    
J. F. Laporte    
G.--ISSUE_BOUNDARYContent-Type: text/plainContent-Disposition: attachment    
filename= 9026272.txt Search Name: 9026.27461Journal    

Resumen

No disponible

 Artículos similares

       
 
Krit Sriworamas, Haris Prasanchum, Seyed Mohammad Ashrafi, Rattana Hormwichian, Rapeepat Techarungruengsakul, Ratsuda Ngamsert, Teerajet Chaiyason and Anongrit Kangrang    
This paper presents a comprehensive review of optimization algorithms utilized in reservoir simulation-optimization models, specifically focusing on determining optimal rule curves. The study explores critical conditions essential for the optimization pr... ver más
Revista: Water

 
Fakhar Uddin, Naveed Riaz, Abdul Manan, Imran Mahmood, Oh-Young Song, Arif Jamal Malik and Aaqif Afzaal Abbasi    
The travelling salesman problem (TSP) is perhaps the most researched problem in the field of Computer Science and Operations. It is a known NP-hard problem and has significant practical applications in a variety of areas, such as logistics, planning, and... ver más
Revista: Applied Sciences

 
Vittorio Maniezzo and Tingting Zhou    
The performance of optimization algorithms, and consequently of AI/machine learning solutions, is strongly influenced by the setting of their hyperparameters. Over the last decades, a rich literature has developed proposing methods to automatically deter... ver más
Revista: Algorithms

 
Honami Tsushima, Takafumi Matsuura and Tohru Ikeguchi    
We have already proposed a multiple-vehicle bike sharing system routing problem (mBSSRP) to adjust the number of bicycles at each port using multiple vehicles in short time. However, there are many strict constraints in the mBSSRP, thus it is difficult t... ver más
Revista: Applied Sciences

 
Hubert Anysz, Jerzy Roslon and Andrzej Foremny    
There are several factors influencing the time of construction project execution. The properties of the planned structure, the details of an order, and macroeconomic factors affect the project completion time. Every construction project is unique, but th... ver más
Revista: Applied Sciences