|
|
|
Ana Majstorovic and Nik?a Jajac
Management of nonurban road network maintenance is a complex management process that requires the inclusion of many technical, economic, and other characteristics of the problem, as well as the continuous application of new knowledge and approaches, to m...
ver más
|
|
|
|
|
|
Assed N. Haddad, Bruno B. F. da Costa, Larissa S. de Andrade, Ahmed Hammad and Carlos A. P. Soares
Supply chain management is an emerging topic in the oil and gas industry. There is higher exposure of contractors to undesirable incidents and supplier selection is a multicriteria decision problem (MCDM). A fuzzy-TOPSIS method was employed in the evalua...
ver más
|
|
|
|
|
|
Faried Effendy,Kartono Kartono,Dyah Herawatie
Pág. pp. 32 - 47
This research aims to build a boarding house recommender system based on the Fuzzy TOPSIS method. This application can be utilized by the student community to discover a suitable boarding house. This research uses the classic life cycle (waterfall)...
ver más
|
|
|
|
|
|
Tae Hyung Kim, Byunghyun Kim and Kun-Yeun Han
This paper proposes a new approach to consider the uncertainties for constructing flood hazard maps for levee failure. The flood depth, velocity, and arrival time were estimated by the 2-Dimensional model and were considered as flood indices for flood ha...
ver más
|
|
|
|
|
|
Zeng Wang, Weidong Liu, Minglang Yang and Dongji Han
As a Kansei engineering design expert system, the product form design multi-objective evolutionary algorithm model (PFDMOEAM) contains various methods. Among them, the multi-objective evolutionary algorithm (MOEA) is the key to determine the performance ...
ver más
|
|
|