Inicio  /  Nauka ta Progres Transportu  /  Núm: 33 Par: 0 (2010)  /  Artículo
ARTÍCULO
TITULO

THE NETWORK MODEL OF ?BUILDING - INVESTMENT - PROTECT? IS UPGRADED APPARATUS TO CONTROL FOR PROCESS OF BUILDING ORGANIZATIONS AND RATIONAL USING CUSTOMERS? RESOURCES OF BUILDING PROJECT

D. O. Prihodko    

Resumen

As an innovative instrument of design of processes of construction organization, it is offered the determined network model «Bud-Invest-Protect» with the parameters of new content, which provides both the rhythm of implementation of preparatory, build and special works and meeting to the customer?s requirements in relation to organizationaland-technologic reliability of those organizations, which perform the preparatory, build and special works.

 Artículos similares

       
 
Genesis Camila Cervantes Puma, Adriana Salles, Janez Turk, Viorel Ungureanu and Luís Bragança    
This research explores sustainable construction practices focusing on material reuse, specifically reclaimed structural steel and slag. In general, the building stock is not designed for deconstruction, and material recovery for reuse at the end of life ... ver más
Revista: Buildings

 
Zhixin Li, Song Ji, Dazhao Fan, Zhen Yan, Fengyi Wang and Ren Wang    
Accurate building geometry information is crucial for urban planning in constrained spaces, fueling the growing demand for large-scale, high-precision 3D city modeling. Traditional methods like oblique photogrammetry and LiDAR prove time consuming and ex... ver más

 
Sujin Woo, Kyungmo Kang and Sangyun Lee    
In 2021, the South Korean government highlighted the Green Remodeling Project for Public Buildings as a crucial initiative for reducing building emissions and tackling post-COVID challenges. Aimed at enhancing energy efficiency and living conditions in p... ver más
Revista: Buildings

 
Dejiang Wang, Quanming Jiang and Jinzheng Liu    
In the field of building information modeling (BIM), converting existing buildings into BIM by using orthophotos with digital surface models (DSMs) is a critical technical challenge. Currently, the BIM reconstruction process is hampered by the inadequate... ver más
Revista: Buildings

 
Ji Bian, Changchun Liu, Chunyang Zuo, Jianli Hao, Wenting Ma, Baoyin Duan, Congda Chen and Jixuan Liu    
Since decoration is an essential part of buildings, the carbon emissions generated by decoration work should not be ignored. In recent years, prefabricated decoration has attracted much attention as efforts are made to pursue green, low-carbon, and waste... ver más
Revista: Buildings