Inicio  /  Applied Sciences  /  Vol: 9 Par: 7 (2019)  /  Artículo
ARTÍCULO
TITULO

Research on Control Methods for the Pressure Continuous Regulation Electrohydraulic Proportional Axial Piston Pump of an Aircraft Hydraulic System

Peng Zhang and Yunhua Li    

Resumen

A structural scheme is proposed to match the pump delivery pressure and the aircraft load. PID, LQR and backstepping sliding control method are used.

 Artículos similares

       
 
Lucas Schmidt Goecks, Anderson Felipe Habekost, Antonio Maria Coruzzolo and Miguel Afonso Sellitto    
Digital transformations in manufacturing systems confer advantages for enhancing competitiveness and ensuring the survival of companies by reducing operating costs, improving quality, and fostering innovation, falling within the overarching umbrella of I... ver más

 
Chunyu Song, Teer Guo, Jianghua Sui and Xianku Zhang    
In order to solve the problem of the dynamic positioning control of large ships in rough sea and to meet the need for fixed-point operations, this paper proposes a dynamic positioning controller that can effectively achieve large ships? fixed-point contr... ver más

 
Ziqi Zhou, Pan Geng, Wei Cao and Xiaoyan Xu    
In the navigation of rudderless dual-motor propulsion ships, it is often necessary for the dual motor to run stably at different given speeds. However, the existing coupling strategies cannot achieve precise cooperative control of the dual motor under di... ver más

 
Michal Welcer, Nezar Sahbon and Albert Zajdel    
Modern aviation technology development heavily relies on computer simulations. SIL (Software-In-The-Loop) simulations are essential for evaluating autopilots and control algorithms for multi-rotors, including drones and other UAVs (Unmanned Aerial Vehicl... ver más
Revista: Aerospace

 
Mehran Vahedi Nikbakht, Mohammad Gheibi, Hassan Montazeri, Reza Yeganeh Khaksar, Reza Moezzi and Amir Vadiee    
Construction projects, especially those for commercial purposes, require thorough planning and control to ensure success within predetermined budgets and timelines. This research, conducted in Mashhad, Iran, employs the analytic hierarchy process (AHP) a... ver más
Revista: Infrastructures