ARTÍCULO
TITULO

Study of relationship between rework and labor productivity in Building Construction Projects

Ibrahim Mahamid    

Resumen

No disponible

 Artículos similares

       
 
Zhike Zou, Longcang Shu, Xing Min and Esther Chifuniro Mabedi    
The artificial recharge of stormwater is an effective approach for replenishing aquifer and reduce urban waterlogging, but prone to clogging by suspended particles (SP) that are highly heterogeneously sized. In this paper, the transport and deposition of... ver más
Revista: Water

 
Samuel de Oliveira, Oguzhan Topsakal and Onur Toker    
Automated Machine Learning (AutoML) is a subdomain of machine learning that seeks to expand the usability of traditional machine learning methods to non-expert users by automating various tasks which normally require manual configuration. Prior benchmark... ver más
Revista: Information

 
Jun Peng and Baohua Su    
The task of aspect-based sentiment analysis (ASBA) is to identify all the sentiment analyses expressed by specific aspect words in the text. How to identify specific objects (i.e., aspect words), describe the modifiers of the specific objects (i.e., opin... ver más
Revista: Applied Sciences

 
Yilinuer Alifujiang, Na Lu, Pingping Feng and Ying Jiang    
In the context of sustainable economic development, the current dilemma of water utilization can be resolved by improving water utilization and achieving an excellent decoupling state between economic growth and water utilization. The utilization of wate... ver más
Revista: Water

 
Xuyuan Zhang, Yingqing Guo, Haoran Luo, Tao Liu and Yijun Bao    
The rapid identification of the amount and characteristics of chemical oxygen demand (COD) in influent water is critical to the operation of wastewater treatment plants (WWTPs), especially for WWTPs in the face of influent water with a low carbon/nitroge... ver más
Revista: Water