Resumen
In this paper, a bearing in situ replacement scheme for an existing busy railway bridge is proposed; its safety and stability in the critical process of construction are analyzed, and the implementation scheme, problems, and their solutions in the actual construction are introduced, which can provide a reference for the practical application of the related projects.