Inicio  /  Infrastructures  /  Vol: 1 Par: 1 (2016)  /  Artículo
ARTÍCULO
TITULO

Key Construction Technology of Shield Tunneling Crossing underneath a Railway

Jinjin Ge    
Ying Xu and Weiwei Cheng    

Resumen

The shield tunnel of the Kunming subway crosses beneath the Kun-Shi Railway. Due to the high requirements of railway track for settlement control, this article proposes the following technical measures for controlling the settlement based on the analysis of risks arising from the shield crossing railway: (1) Reinforcing the stratum of the region crossed by the shield in advance to achieve high stability; (2) Using a reinforced segment for the shield tunnel and increasing reserved grouting holes for construction; (3) Reasonably configuring resources, optimizing construction parameters, strengthening monitoring and information management during the shield crossing. In strict accordance with the construction plan, the shield successfully and safely crossed beneath the Kun-Shi Railway; this provides experience that can be used in similar projects in the future.