TITULO

Large Uncertainties in CO2 Water?Air Outgassing Estimation with Gas Exchange Coefficient KT for a Large Lowland River

Anamika Dristi and Y. Jun Xu    

Resumen

Aquatic CO2 emission is typically estimated (i.e., not measured) through a gas exchange balance. Several factors can affect the estimation, primarily flow velocity and wind speed, which can influence a key parameter, the gas exchange coefficient KT in the balancing approach. However, our knowledge of the uncertainty of predictions using these factors is rather limited. In this study, we conducted a numeric assessment on the impact of river flow velocity and wind speed on KT and the consequent CO2 emission rate. As a case study, we utilized 3-year (2019?2021) measurements on the partial pressure of dissolved carbon dioxide (pCO2) in one of the world?s largest alluvial rivers, the lower Mississippi River, to determine the difference in CO2 emission rate estimated through three approaches: velocity-based KT, wind-based KT, and a constant KT (i.e., KT = 4.3 m/day) that has been used for large rivers. Over the 3-year study period, river flow velocity varied from 0.75 ms-1 to 1.8 ms-1, and wind speed above the water surface fluctuated from 0 ms-1 to nearly 5 ms-1. Correspondingly, we obtained a velocity-based KT value of 7.80?22.11 m/day and a wind-speed-based KT of 0.77?8.40 m/day. Because of the wide variation in KT values, the estimation of CO2 emission using different approaches resulted in a substantially large difference. The velocity-based KT method yielded an average CO2 emission rate (FCO2) of 44.36 mmol m-2 h-1 for the lower Mississippi River over the 3-year study period, varying from 6.8 to 280 mmol m-2 h-1. In contrast, the wind-based KT method rendered an average FCO2 of 10.05 mmol m-2 h-1 with a small range of fluctuation (1.32?53.40 mmol m-2 h-1,), and the commonly used constant KT method produced an average FCO2 of 11.64 mmol m-2 h-1, also in a small range of fluctuation (2.42?56.87 mmol m-2 h-1). Based on the findings, we conclude that the effect of river channel geometry and flow velocity on CO2 outgassing is still largely underestimated, and the current estimation of global river CO2 emission may bear large uncertainty due to limited spatial coverage of flow conditions and the associated gas exchange variation.

 Artículos similares

       
 
Kees Nederhoff, Sean C. Crosby, Nate R. Van Arendonk, Eric E. Grossman, Babak Tehranirad, Tim Leijnse, Wouter Klessens and Patrick L. Barnard    
The Puget Sound Coastal Storm Modeling System (PS-CoSMoS) is a tool designed to dynamically downscale future climate scenarios (i.e., projected changes in wind and pressure fields and temperature) to compute regional water levels, waves, and compound flo... ver más
Revista: Water

 
Hua Huang, Zhenfeng Peng, Jinkun Hou, Xudong Zheng, Yuxi Ding and Han Wu    
Disc buckle steel pipe brackets are widely used in building construction due to the advantages of its simple structure, large-bearing capacity, rapid assembling and disassembling, and strong versatility. In complex construction projects, the uncertaintie... ver más
Revista: Buildings

 
Rouzbeh Shabani, Olav Torp, Ole Jonny Klakegg and Agnar Johansen    
To succeed with projects, we need to understand and manage uncertainty. Uncertainties impact a project?s cost, time, and quality performance. The project?s front end is challenging for decision makers due to the high level of uncertainty. This paper iden... ver más
Revista: Infrastructures

 
Marta Ramalho Kresse Bastos    
Governance processes and image management strategies in large-scale urban development projects are exposed to a range of contextual and internal actor-network-related influences. These relations are complex and, due the long realization time of these pro... ver más
Revista: Buildings

 
Xiaolong Zhou, Taoxin Deng, Li Chen, Jie Chen, Ao Li, Qijie Yuan, Wei Fang and Jianfeng Gu    
In the construction process of large-scale bridges, there are uncertainties and time-varying factors in the environment and construction loads. It is difficult to make accurate estimates of the theoretical calculation models of construction control in ad... ver más
Revista: Buildings