Optimal Design of Segment Storage and Hoisting of Precast Segmental Composite Box Girders with Corrugated Steel Webs

Qigang Song    
Wenqin Deng    
Duo Liu    
Huiteng Pei    
Zongqing Peng and Jiandong Zhang    

Resumen

To optimize the segment storage and hoisting plan of precast segmental composite box girders with corrugated steel web bridges, China?s first precast segmental composite girder bridge with corrugated steel webs is taken as the background. The difference between the precast segmental composite box girders with corrugated steel webs and the traditional concrete box girder is proven by numerical simulation. The stress and deformation characteristics of the segmental girder during storage and hoisting are analysed, and reasonable control measures are proposed. The data suggested that compared with ordinary concrete box girders, the smaller torsional stiffness and lateral stiffness of the precast segmental composite box girder with corrugated steel web segments lead to larger roof stress and deformation during the storage and hoisting periods. The number of storage layers of segmental girders should not exceed two, and the four hoisting point scheme should be adopted for hoisting. It is recommended to set one to two channel steel supports of no less than 20 grade steel between the top and bottom plates to avoid excessive deformation of the roof. With the increase in the segment length, the roof deformation and stress increased regardless of the storage period and the hoisting period. If the safety factor needs to be increased, when the segment length is short (1.6 m?3.2 m), increasing the support size is recommended. When the segment length is longer (4.0 m, 4.8 m), increasing the number of supports is recommended.

 Artículos similares

       
 
Dong-Jin Kim, Lwun Poe Khant, Daniel Darma Widjaja and Sunkuk Kim    
The production of steel rebar is an energy-intensive process that generates CO2 emissions. In construction, waste is generated by cutting stock-length rebar to the required lengths. The reduction rate achieved in most previous studies was limited due to ... ver más
Revista: Buildings

 
Jian Yang, Ming Sun, Guohuang Yao, Haizhu Guo and Rumian Zhong    
This study explores an advanced prefabricated composite structure, namely ECC/RC composite shear walls with enhanced seismic performance. This performance enhancement is attributed to the strategic use of engineered cementitious composites (ECC) known fo... ver más
Revista: Buildings

 
Zefa Wang, Min Wang, Yaolong Wang, Tiantian Huang, Jing Chen and Tingfeng Liu    
The design of the enclosure layout is crucial in establishing a comfortable wind environment in Chinese classic landscape gardens. The Ruins Park of the Old Summer Palace exemplifies the mountain construction techniques used in classical Chinese flat gar... ver más
Revista: Buildings

 
Mana Abusaq and Mohamed A. Zohdy    
Amidst a growing global focus on sustainable energy, this study investigates the underutilization of renewable resources in the southern region of Saudi Arabia, with a specific emphasis on the Najran Secondary Industrial Institute (NSII). This research p... ver más

 
Lilu Zhu, Yang Wang, Yunbo Kong, Yanfeng Hu and Kai Huang    
The integration of geospatial-analysis models is crucial for simulating complex geographic processes and phenomena. However, compared to non-geospatial models and traditional geospatial models, geospatial-analysis models face more challenges owing to ext... ver más