Redirigiendo al acceso original de articulo en 15 segundos...
Inicio  /  Buildings  /  Vol: 12 Par: 7 (2022)  /  Artículo
ARTÍCULO
TITULO

Development and Application of an Integrated Management System for Off-Site Construction Projects

YeEun Jang    
Jae-Man Lee and JeongWook Son    

Resumen

The off-site construction (OSC) method has attracted the interest of experts to resolve productivity stagnation and lack of skilled workforce and to reduce greenhouse gas emissions in the construction industry. Due to the unique characteristics of OSC projects, wherein building elements are produced in a factory, transported, and installed in the field, a management approach that differs from the management techniques of previous construction projects is required. Accordingly, with this study, we examined the characteristics of OSC projects and derived key management items through literature review, case analysis, and expert meetings to develop an integrated management system for OSC projects (OSC-IMS). The proposed system, OSC-IMS, integrates the entire supply chain of the OSC project. It includes the following functions: drawing management, scheduling and planning, site installation planning, production planning, production monitoring, shipping and transportation, delivery and inspection, site installation monitoring, and progress payment management. To verify the applicability and effectiveness of OSC-IMS, it was implemented in four projects. The application of the system to the case studies demonstrated the improvements in work efficiency and accuracy and decreased waste time in every work step. The findings indicate that the system can enhance project performance. This study contributes to the identification of the features and key elements of OSC management such that these factors can be linked with managing system development. This work describes the overall effect of the proposed system on real projects.

 Artículos similares

       
 
Liufeng Tao, Kai Ma, Miao Tian, Zhenyang Hui, Shuai Zheng, Junjie Liu, Zhong Xie and Qinjun Qiu    
The efficient and precise retrieval of desired information from extensive geological databases is a prominent and pivotal focus within the realm of geological information services. Conventional information retrieval methods primarily rely on keyword matc... ver más

 
Valeriy Ivanov and Maxim Tereshonok    
The OSI model used to be a common network model for years. In the case of ad hoc networks with dynamic topology and difficult radio communications conditions, gradual departure is happening from the classical kind of OSI network model with a clear deline... ver más
Revista: Future Internet

 
Mazen A. Al-Sinan, Abdulaziz A. Bubshait and Zainab Aljaroudi    
Recent advancements in machine learning (ML) applications have set the stage for the development of autonomous construction project scheduling systems. This study presents a blueprint to demonstrate how construction project schedules can be generated aut... ver más
Revista: Buildings

 
Ze Liu, Jingzhao Zhou, Xiaoyang Yang, Zechuan Zhao and Yang Lv    
Water resource modeling is an important means of studying the distribution, change, utilization, and management of water resources. By establishing various models, water resources can be quantitatively described and predicted, providing a scientific basi... ver más
Revista: Water

 
Lea Dasallas, Junghwan Lee, Sungphil Jang and Suhyung Jang    
Smart water cities (SWCs) use advanced technologies for efficient management and preservation of the urban water cycle, strengthening sustainability and improving the quality of life of the residents. This research aims to develop measurement and evaluat... ver más
Revista: Water