SCHEDULE BUFFERS: A COMPLEMENTARY STRATEGY TO REDUCE THE VARIABILITY IN THE PROCESSES OF CONSTRUCTION

Vicente Gonzalez    
Luis Fernando Alarcón    

Resumen

Construction schedules are critical to the success of construction projects, as they define the sequence, rhythm and duration of productive processes. However, the traditional construction schedules have not adequately coped with the variable nature of these processes that are reflected in interferences, delays and higher costs to attain a project efficiently. Even though there exist techniques based on Lean Production, such as, for instance, Last Planner which reduces the variability to reasonable levels, many projects either do not apply these techniques or there exist variability that is not controlled as yet. This investigation aims at using Schedule Buffers as a complementary strategy to protect from the production processes variability in the construction projects and also describes the main aspects of a Methodology of Management of Schedule Buffers in Repetitive Projects. This article addreses a number of issues: the problem of variability in construction, the main control techniques and construction schedules, the major investigations on Buffers in construction, and the conceptual aspects of a Methodology of Management of Schedule Buffers in Repetitive Projects. Existing literature show that there do exist any analytic models that permit determining optimum sizes of Buffers, nor methodologies to manage them appropriately. There is no conceptual structure that integrates the diverse types of Buffers that can be used in construction, so as to compare and evaluate their use (either jointly or separately). The use of optimumsized Buffers will facilitate the development of a construction schedule with a greater predictive capacity, as well as, an appropriate management of them will improve the production flow in site in the projects. This work is the preliminary development of a doctoral investigation supported by the Centro de Excelencia en Gestión de Producción, GEPUC, of the Pontificia Universidad Católica de Chile.

 Artículos similares

       
 
Fan Ding, Min Liu, Simon M. Hsiang, Peng Hu, Yuxiang Zhang and Kewang Jiang    
The complexity and uncertainty of construction projects contribute to low efficiency in the construction industry. This research applied the Takt-time planning method to optimize the construction working process, and proposed a risk control framework bas... ver más
Revista: Buildings

 
Flavia D. Frederick, Malvin S. Marlim and Doosun Kang    
Chlorine decay over time and distance travelled poses challenges in maintaining consistent chlorine levels from treatment plants to demand nodes in water distribution networks (WDNs). Many studies have focused on optimizing chlorine booster systems and a... ver más
Revista: Water

 
Sebastiano Gaiardelli, Damiano Carra, Stefano Spellini and Franco Fummi    
Efficiently managing resource utilization is critical in manufacturing systems to optimize production efficiency, especially in dynamic environments where jobs continually enter the system and machine breakdowns are potential occurrences. In fully automa... ver más
Revista: Applied Sciences

 
Emma Fitzgerald and Michal Pióro    
Industry 4.0, with its focus on flexibility and customizability, is pushing in the direction of wireless communication in future smart factories, in particular, massive multiple-input-multiple-output (MIMO) and its future evolution of large intelligent s... ver más
Revista: Future Internet

 
Bae-Seon Park and Hak-Tae Lee    
This paper demonstrates the effectiveness of the Extended First-Come, First-Served (EFCFS) scheduler for integrated arrival and departure scheduling by comparing the scheduling results with the recorded operational data at Incheon International Airport (... ver más
Revista: Aerospace