Redirigiendo al acceso original de articulo en 19 segundos...
ARTÍCULO
TITULO

International comparisons of cost and productivity in construction: a bad example

Rick Best    

Resumen

In a report published in June 2012 the Business Council of Australia (BCA) reported that it costs considerably more to build a variety of types of infrastructure in Australia than it does in the US. Airports (90% more costly) and hospitals (62%) were quoted as the worst cases with other projects ranging from 26% to 43% more. They used these figures to conclude that Australia is a high cost, low productivity environment for building infrastructure projects. These claims were based on cost/m2 figures published by a major international construction consultancy. The method used by the BCA is flawed in two ways: one is the in the use of costs that are recognised as giving only the broadest of indications of probable costs and the second is the use of exchange rates to convert Australian construction costs to US dollars. Careful analysis of the methodology used, supported by a series of other comparisons based on other data sources and other conversion factors (purchasing power parities or PPPs), suggests that in real terms it probably costs no more to build in Australia than it does in the US and that it may well be cheaper to build in Australia than it is in the US.

 Artículos similares

       
 
Konstantinos P. Tsagarakis    
In addressing the topic of decision making in the water sector, what has been suggested to be useful up to this point is benchmarking. This paper aims at exploring the relationship between the Operating Cost Coverage Index and customer complaints about w... ver más
Revista: Water

 
Rick Best     Pág. 82 - 88
In a report published in June 2012 the Business Council of Australia (BCA) reported that it costs considerably more to build a variety of types of infrastructure in Australia than it does in the US. Airports (90% more costly) and hospitals (62%) were quo... ver más

 
Rick Best     Pág. 29 - 38
Most comparisons of construction industry performance requirethat construction costs be converted to a common base. Existingmechanisms for such conversions produce unreliable results.A proposed method for producing industry-specifi c conversionfactors wa... ver más

 
Carina Di Candia, Laura Flores, Monica Trias     Pág. 26
According as the international definition of Flexible Scope, a laboratory must demonstrate face with the accreditation body that it has the knowledge, experience and competence to work within the full range of its flexible scope, as well as possessing su... ver más
Revista: Innotec