Redirigiendo al acceso original de articulo en 18 segundos...
Inicio  /  Buildings  /  Vol: 5 Núm: 4 Par: Decembe (2015)  /  Artículo
ARTÍCULO
TITULO

Requirements of Integrated Design Teams While Evaluating Advanced Energy Retrofit Design Options in Immersive Virtual Environments

Xue Yang    
Semiha Ergan and Katie Knox    

Resumen

No disponible

 Artículos similares

       
 
Jian Wang, Ze Chen, Linghao Li, Chuan Wang, Kangle Teng, Qiang He, Jiren Zhou, Shanshan Li, Weidong Cao, Xiuli Wang and Hongliang Wang    
Submersible tubular pumps are an ideal choice for pump stations that require high flow rates and low lift. These pumps combine the unique features of submersible motors with axial flow pump technology, making them highly efficient and cost-effective. The... ver más
Revista: Water

 
Mengchi Xing, Haojiang Deng and Rui Han    
The 5G core network adopts a Control and User Plane Separation (CUPS) architecture to meet the challenges of low-latency business requirements. In this architecture, a balance between management costs and User Experience (UE) is achieved by moving User P... ver más
Revista: Future Internet

 
Anna Agustí-Torra, Marc Ferré-Mancebo, Gabriel David Orozco-Urrutia, David Rincón-Rivera and David Remondo    
Time-Sensitive Networking (TSN) aims to provide deterministic communications over Ethernet. The main characteristics of TSN are bounded latency and very high reliability, thus complying with the strict requirements of industrial communications or automot... ver más
Revista: Future Internet

 
Yan Jiang, Fei Guo, Wenlong Wang, Guanghua Yang, Jinchao Yue and Yibin Huang    
The stability of a double-row steel sheet pile cofferdam structure under soft ground conditions was investigated in this study, using the temporary cofferdam of the Shenzhen?Zhongshan cross-river channel as the engineering background. The stability of th... ver más
Revista: Water

 
Yuan Huang and Anqi Wang    
The comparison of carbon emissions between prefabricated and traditional cast-in-place construction methods in actual example buildings has yielded inconsistent results due to the difficulty in accounting for design parameter uncertainty. Additionally, t... ver más
Revista: Buildings