Major Factors Causing Delay in the Delivery of Manufacturing and Building Projects in Saudi Arabia

Resumen

There have been many studies done on the causes of delay on construction projects and building projects all around the world. They use different methods, on different geographical areas, and they come up with different results. There are, however, few studies on industrial and building projects. This paper focuses on industrial/manufacturing projects in Saudi Arabia. The aim of this paper is to identify the major causes of delay in the manufacturing projects in Saudi Arabia. The top causes of delay have been identified through a literature survey and interviews with experts from the industrial field in Saudi Arabia. Twenty-two factors have been identified and listed in a survey that was distributed to professionals in the same field. Two categorizations were made: the first is based on the impact of the cause, and the second is based on the frequency of occurrence of the identified cause. It has been found that the top five impacted causes of delay in the delivery of industrial projects in Saudi Arabia are: difficulties in financing project by contractor/manufacturer, late procurement of materials, late delivery of materials, delay in progress payments, and delay in approving design documents, respectively. In terms of frequency, the top five identified causes are: delay in progress payments, difficulties in financing project by contractor/manufacturer, slowness in decision making, late procurement of materials, and delay in approving design documents, respectively. The diversity of the participants is an important point; therefore, the respondents were from different job positions (management, engineering, etc.), and different categories (contractor, owner, manufacturer, consultant, etc.). It is worth noting that this paper serves not only as an authentic study of the causes of delay in the delivery of industrial projects in Saudi Arabia which is a field that is not widely covered, but also as a fresh paper that gives an indication of the changes that happen to the business over time as compared to previous work.

 Artículos similares

       
 
Lama Ayad, Hocine Imine, Claudio Lantieri and Francesca De Crescenzio    
Cyclists are at a higher risk of being involved in accidents. To this end, a safer environment for cyclists should be pursued so that they can feel safe while riding their bicycles. Focusing on safety risks that cyclists may face is the main key to prese... ver más
Revista: Infrastructures

 
Jia Fang, Xiang Yan, Tao Tao, Changjie Chen     Pág. 215 - 239
Understanding the connections between the built environment and travel mode choice is a major research topic in transportation. However, existing studies usually examine the relationship through trip-based analyses rather than tour-based approaches. A to... ver más

 
Dzhema Melkonyan and Sherin Sugathan    
Increasing groundwater levels (GWLs) may become one of the most serious issues for the city of Odessa, Ukraine. This study investigated the spatial distribution characteristics and multifractal scaling behaviour of the groundwater-level/-depth fluctuatio... ver más
Revista: Water

 
Daniele Martini, Martino Aimar, Fabio Borghetti, Michela Longo and Federica Foiadelli    
In Italy, the availability of service areas (SAs) equipped with charging stations (CSs) for electric vehicles (EVs) on highways is limited in comparison to the total number of service areas. The scope of this work is to create a prototype and show a diff... ver más
Revista: Infrastructures

 
Yan Fu, Qingwen Qi, Lili Jiang and Yapeng Zhao    
Accurately identifying the patterns of evolution in farmland plays an important role in optimizing farmland management. The aim of this study is to classify the evolution patterns of farmland in China and explore related mechanisms, providing a reference... ver más