Redirigiendo al acceso original de articulo en 18 segundos...
ARTÍCULO
TITULO

Construction delays causing risks on time and cost - a critical review

Chidambaram Ramanathan    
S P Narayanan    
Arazi B Idrus    

Resumen

There is an increase in the number of construction projects experiencing extensive delays leading to exceeding initial time and cost budget.  This paper reviews 41 studies around the world which surveyed the delay factors and classified them into Groups.  The main purpose of this paper is to review literature, each of which have categorized the causes that are responsible for time delays and cost overrun in projects. The collected list has 113 causes for delays categorized in to 18 different groups.  Most of the researches have analysed the responses from the Questionnaire survey.    The collected data are used to rank the problem.  The data are further used to investigate and analyse Important Index, Frequency Index, Severity Index, Relative Important Index, Relative Importance Weight, Weighted Average, Mean, Standard Deviation and Variance.  The collective comparison has revealed that the ranking given by all the researchers is not the same.  Further each and every study has different rank ratings for the different group of the delays.  This review paper attempts to provide an updated compilation of the earlier studies on ranking of the delay causers, which are never similar and constant for universal projects.  It is concluded that a separate study is required for identifying the factors causing delay for projects operated in Sabah, East Malaysia.

 Artículos similares

       
 
Wenfeng Du, Liming Zhu, Hao Zhang, Zhiyong Zhou, Kewei Wang and Nasim Uddin    
The development and application of new Fiber Reinforced Polymer (FRP) material and 3D printing construction technology provide a basis for making up for the shortcomings of traditional thin-shell structures and building new thin-shell structures with bet... ver más
Revista: Buildings

 
B. Hemanth Sai Kalyan, Anandh Sekar, S. Sindhu Nachiar and P. T. Ravichandran    
Construction disputes have become a recurrent phenomenon in the industry, due to which progress is halted. From a bird?s eye perspective, the most frequent cause of a dispute might be payment issues. However, when observed keenly, it has an inter-relatio... ver más
Revista: Buildings

 
Irwan Irwan,Melloukey Ardan,Nuril Mahda Rangkuti,Febrina Monalisa     Pág. 20 - 29
Project delays are the main contribution to project cost overruns. The research intends to determine the main factor that cause delays in construction projects at PT. PLN (PERSERO) UIP Sumbagut. In this research, there were 31 variables which were groupe... ver más

 
Petteri Annunen, Harri Haapasalo    
The construction industry has been suffering from modest productivity development in recent decades. To address the recognized problems, collaborative delivery methods are replacing traditional project delivery models, especially in large and complex pro... ver más

 
Shuai Yang, Rui Ren and Ya-Qiong Wang    
In tunnel construction, the difficulty of ventilation gradually increases with the increase of ventilation distance, which endangers construction safety and delays construction progress. This paper presents an air cabin ventilation system of the tunnel d... ver más
Revista: Buildings