Inicio  /  Hydrology  /  Vol: 4 Par: 3 (2017)  /  Artículo
ARTÍCULO
TITULO

Groundwater Engineering in an Environmentally Sensitive Urban Area: Assessment, Landuse Change/Infrastructure Impacts and Mitigation Measures

Yohannes Yihdego    
Cara Danis and Andrew Paffard    

Resumen

A rise in the shallow unconfined groundwater at a site in Australia is causing water logging of the underground facility in the affected area. Realizing this problem, a study was conducted to identify the source of water that is causing the rise and to develop an implementation and operation plan of the mitigation (dewatering system). Modelling was undertaken using MODFLOW-SURFACT code, within the framework of Visual MODFLOW, to assess the spatial and temporal groundwater level at the site. The study undertaken incorporates compilation and assessment of available data, including a list of factual information reviewed, development of a conceptual groundwater model for the site and modelling of the pre and post development conditions. The outcomes of the assessment indicate water level rises due to the construction of the embankment are likely less than 0.12 m and changes in land, such as affected area burial, may change aquifer characteristics more significantly than the embankment. It is concluded that the elevated groundwater levels in the affected area are most likely a result of above average rainfall since 2007 and long term cumulative land use changes. The embankment construction is just one of many land use changes that have occurred both within and surrounding the affected area and likely only a minor contributor to the elevated water levels. Greater contribution may be attributed to re-direction of the natural flow paths the railway culvert weir reducing the overland flow gradient and ongoing changes (burial) within the affected area and including the embankment. The model findings gives answers on what factors may be/are causing/contributing to, the higher than usual groundwater levels in the study area. A combination of drainage and/or pumping (dewatering system) is suggested as a solution to overcome the problem of rising groundwater levels at the site. Further, the model output can aid in assessing mitigation options, including horizontal drainage networks and pumping to control for the rising water table conditions in the area, depending on the level of treatment and pathogenic criteria.

 Artículos similares

       
 
Xiaohai Fu, Jinze Li, Jiankun Liu, Zheng Hu and Changyi Tang    
Based on a plain concrete pile composite foundation project in the coastal area of Zhuhai, considering the complex hydraulic load environment induced by tidal water-level changes, finite element simulations and parameter calibrations were carried out to ... ver más
Revista: Buildings

 
Walaa Elnashar, Hany F. Abd-Elhamid, Martina Zelenáková and Ahmed Elyamany    
Excessive irrigating water that has not been adequately drained may cause more water to enter the crop root zone than is necessary. As a result, issues with increasing water table levels, waterlogging, and salinity get worse and cause crop productivity l... ver más
Revista: Water

 
Yuxiang Liu, Guanqun Ma, Yu Han, Yubo Wang, Cui Tang, Ning Tian, Xiaoshan Tang, Lulu Jiang, Hanyue Zuo, Yuexing Zhang, Shanlin Wang, Ao Wang, Deqiang Mao and Shiliang Liu    
The assessment of the impact of abandoned mine water on the underwater environment is critical for protecting and restoring the groundwater environment. Taking the abandoned coal mining area in the west of Zhangqiu District as the engineering background ... ver más
Revista: Water

 
Charalampos Konstantinou and Giovanna Biscontin    
Fluid injection in a porous medium is the underlying mechanism for many applications in the fields of groundwater hydraulics, hydrology and hydrogeology, and geo-environmental engineering and in the oil and gas industry. Fluid flow experiments in porous ... ver más
Revista: Hydrology

 
Candan Gokceoglu, Ebu Bekir Aygar, Hakan A. Nefeslioglu, Servet Karahan and Suat Gullu    
The T26 tunnel was designed within the scope of the Ankara-Istanbul high-speed railway in accordance with the speed of 250 km/h. Some serious problems and excessive deformations were encountered during the excavation works. The deformations in the tunnel... ver más
Revista: Infrastructures