Redirigiendo al acceso original de articulo en 22 segundos...
Inicio  /  Buildings  /  Vol: 12 Par: 10 (2022)  /  Artículo
ARTÍCULO
TITULO

Decision Analysis of a Reinforcement Scheme for In-Service Prestressed Concrete Box Girder Bridges Based on AHP and Evaluation of the Reinforcement Effect

Haikuan Liu    
Jie Li    
Junfeng Zhang and Dongyuan Pang    

Resumen

Prestressed concrete girder bridges are widely used worldwide due to their mature construction technology, economical cost, and low maintenance. After a certain number of years of service, prestressed concrete girders inevitably suffer from deterioration of their material properties, cracking, and reduced load-carrying capacity due to the natural environment and long-term vehicle loading. When the performance of a bridge declines to the point that it cannot meet the requirements of normal use, reinforcement and maintenance are required. In this study, a 5 × 45 m prestressed concrete continuous box girder bridge that has been in service for 25 years is taken as an example, and the causes of crack development and deterioration of the technical condition of the bridge are analyzed. Based on an analysis of the causes, reinforcement schemes for overall replacement of the girder and adding bridge piers are proposed. According to a comparison of the advantages and disadvantages, a decision analysis of the reinforcement scheme is carried out via the analytic hierarchy process (AHP). The vector weights of the two schemes were found to be 0.4288 and 0.5712, respectively, indicating that adding bridge piers is more advantageous than overall replacement of the girder. Thus, a scheme of adding five piers was adopted to reinforce the bridge. A load test was then performed after the reinforcement, and both the test deflection and strain calibration coefficients were found to be less than 1, indicating that the force state of the added piers and bearings was better than the theoretical calculations. The present study shows that the reinforcement scheme of adding piers can achieve the design goal. The working status of the box girder was significantly improved, the crack development of box girder was suppressed, and the service life of the bridge was prolonged.

 Artículos similares

       
 
Tongyang Xu, Yuan Liu, Zhaotai Ma, Yiqiang Huang and Peng Liu    
As a new distributed machine learning (ML) approach, federated learning (FL) shows great potential to preserve data privacy by enabling distributed data owners to collaboratively build a global model without sharing their raw data. However, the heterogen... ver más
Revista: Future Internet

 
Dan Xu, Yunxiao Guo, Zhongyi Yu, Zhenfeng Wang, Rongze Lan, Runhao Zhao, Xinjia Xie and Han Long    
Flocking for fixed-Wing Unmanned Aerial Vehicles (UAVs) is an extremely complex challenge due to fixed-wing UAV?s control problem and the system?s coordinate difficulty. Recently, flocking approaches based on reinforcement learning have attracted attenti... ver más
Revista: Drones

 
Abubakar Ahmad Musa, Adamu Hussaini, Cheng Qian, Yifan Guo and Wei Yu    
The Internet of Things (IoT) constitutes a vast network comprising various components such as physical devices, vehicles, buildings, and other items equipped with sensors, actuators, and software. These components are interconnected, facilitating the col... ver más
Revista: Future Internet

 
Yingjie Du and Ning Ding    
Crime is always one of the most important social problems, and it poses a great threat to public security and people. Accurate crime prediction can help the government, police, and citizens to carry out effective crime prevention measures. In this paper,... ver más

 
Zhenwei Yang, Hang Lv, Xinyi Wang, Hengrui Yan and Zhaofeng Xu    
In recent years, inrush water has hampered the regular mining of coal mines, and the proper identification of the source of inrush water is critical to the prevention and management of water hazards in mines. This paper extracts the standard water chemis... ver más
Revista: Water