Redirigiendo al acceso original de articulo en 23 segundos...
Inicio  /  Buildings  /  Vol: 11 Par: 1 (2021)  /  Artículo
ARTÍCULO
TITULO

Proposal for Tower Crane Productivity Indicators Based on Data Analysis in the Era of Construction 4.0

Thomas Danel    
Zoubeir Lafhaj    
Anand Puppala    
Sophie Lienard and Philippe Richard    

Resumen

This article proposes a methodology to measure the productivity of a construction site through the analysis of tower crane data. These data were obtained from a data logger that records a time series of spatial and load data from the lifting machine during the structural phase of a construction project. The first step was data collection, followed by preparation, which consisted of formatting and cleaning the dataset. Then, a visualization step identified which data was the most meaningful for the practitioners. From that, the activity of the tower crane was measured by extracting effective lifting operations using the load signal essentially. Having used such a sampling technique allows statistical analysis on the duration, load, and curvilinear distance of every extracted lifting operation. The build statistical distribution and indicators were finally used to compare construction site productivity.