Redirigiendo al acceso original de articulo en 21 segundos...
Inicio  /  Algorithms  /  Vol: 14 Par: 8 (2021)  /  Artículo
ARTÍCULO
TITULO

Efficient Construction of the Equation Automaton

Faissal Ouardi    
Zineb Lotfi and Bilal Elghadyry    

Resumen

This paper describes a fast algorithm for constructing directly the equation automaton from the well-known Thompson automaton associated with a regular expression. Allauzen and Mohri have presented a unified construction of small automata and gave a construction of the equation automaton with time and space complexity in ??(??log??+??2) O ( m log m + m 2 ) , where m denotes the number of Thompson automaton transitions. It is based on two classical automata operations, namely epsilon-removal and Hopcroft?s algorithm for deterministic Finite Automata (DFA) minimization. Using the notion of c-continuation, Ziadi et al. presented a fast computation of the equation automaton in ??(??2) O ( m 2 ) time complexity. In this paper, we design an output-sensitive algorithm combining advantages of the previous algorithms and show that its computational complexity can be reduced to ??(??×|??=??|) O ( m × | Q = e | ) , where |??=??| | Q = e | denotes the number of states of the equation automaton, by an epsilon-removal and Bubenzer minimization algorithm of an Acyclic Deterministic Finite Automata (ADFA).

 Artículos similares

       
 
Xiaofang Yuan, Yutong Wu, Linhui Sun and Xinping Wang    
The intelligent transformation of coal mines is an inevitable choice to promote the green transformation of energy and to achieve safety and efficiency in the industry. Exploring the path of its efficient construction is the key to realizing the construc... ver más
Revista: Applied Sciences

 
Taesik Kim, Ho Choi, Jinman Jung, Hong Min and Young-Hoon Jung    
The terrestrial photogrammetry technique provides an efficient and accurate solution for evaluating ground deformations induced by construction activities.
Revista: Applied Sciences

 
Feifei Tao, Yanling Pi, Menghua Deng, Yongjun Tang and Chi Yuan    
With the rise of artificial intelligence and big data technologies, it is increasingly significant to apply these emerging technologies to scientific decision-making in water conservancy project construction management in the face of many problems in the... ver más
Revista: Water

 
María Simón-Portela, José Ramón Villar-García, Desirée Rodríguez-Robles and Pablo Vidal-López    
This paper addresses the lack of attention paid by the scientific community to the optimization of timber structures, specifically in the context of large-span agro-industrial constructions. The study focuses on the optimization of a three-dimensional ro... ver más
Revista: Applied Sciences

 
Andelka ?tilic, Adis Pu?ka, Darko Bo?anic and Du?ko Te?ic    
When carrying out construction work, identifying the best contractor is a critical component of the project life cycle in the construction industry. The investor must use effective and efficient strategies to create a competitive bidding environment in p... ver más
Revista: Information